evcharge.online · EV charging site
Beadnell Bay Car Park
Beadnell, NE67 5EE
Beadnell Bay Car Park is an EV charging site in Beadnell, Northumberland, run by evcharge.online. It has a single socket, with Type 2 at up to 7 kW, and the price is listed as 57p per kW. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Seafield Car Park (LiFe (Raw Charging)), 2.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public
- Price
- 57p per kW(from Open Charge Map, 7 Jul 2023)
- Notes
- ( 2 ) 7kW Chargers ( 4 sockets )
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Beadnell Bay Car Park (evcharge.online)?
The listed price is 57p per kW. Prices can change, so check the price at the charger before you start.
How fast is charging at Beadnell Bay Car Park (evcharge.online)?
Up to 7 kW AC via Type 2.
How many charging sockets does Beadnell Bay Car Park (evcharge.online) have?
1 charging socket: 2 × 7 kW Type 2, 2 × 7 kW Type 2.
Who operates Beadnell Bay Car Park?
Beadnell Bay Car Park is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to Beadnell Bay Car Park (evcharge.online)?
Seafield Car Park (LiFe (Raw Charging)) is 2.3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Beadnell Bay Car Park (evcharge.online)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Beadnell Bay Car Park (evcharge.online)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Beadnell Bay Car Park (evcharge.online)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Seafield Car Park · 50 kW · 2.3 mi