Vend Electric · EV charging site
Doxford Hall Hotel and Spa
Doxford Hall Hotel and Spa, Ellingham, NE67 5DN
Doxford Hall Hotel and Spa is an EV charging site in Ellingham, Northumberland, run by Vend Electric. Both of its sockets are 7 kW Type 2, and the price is listed as 42p. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Adderstone, UK (Tesla), 5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Vend Electric
- Opening hours
- Not published
- Access
- Public
- Price
- 42p(from Open Charge Map, 10 Jun 2023)
- Phone (from Open Charge Map)
- 01665 589700
- Notes
- ( 1 ) 7kW Chargers ( 2 sockets ) https://app.vendelectric.com/
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Doxford Hall Hotel and Spa (Vend Electric)?
The listed price is 42p. Prices can change, so check the price at the charger before you start.
How fast is charging at Doxford Hall Hotel and Spa (Vend Electric)?
Up to 7 kW AC via Type 2.
How many charging sockets does Doxford Hall Hotel and Spa (Vend Electric) have?
2 charging sockets: 2 × 7 kW Type 2.
Who operates Doxford Hall Hotel and Spa?
Doxford Hall Hotel and Spa is on the Vend Electric network. For site issues, the operator lists 01665 589700.
Where is the nearest charger with 50 kW or more to Doxford Hall Hotel and Spa (Vend Electric)?
Adderstone, UK (Tesla) is 5 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Doxford Hall Hotel and Spa (Vend Electric)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Doxford Hall Hotel and Spa (Vend Electric)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Doxford Hall Hotel and Spa (Vend Electric)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Sea Lane · 22 kW · 3 mi