evcharge.online · EV charging site
RHS Bridgewater
Bridgewater Way, Walkden, M28 1YB
RHS Bridgewater is an EV charging site in Walkden, City and Borough of Salford, run by evcharge.online. All 6 of its sockets are 7 kW Type 2, and the price is listed as £0.30/kWh. 2 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Novotel Manchester West Hotel (BP Pulse), 0.6 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.30/kWh(from Open Charge Map, 12 Dec 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at RHS Bridgewater (evcharge.online)?
The listed price is £0.30/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at RHS Bridgewater (evcharge.online)?
Up to 7 kW AC via Type 2.
How many charging sockets does RHS Bridgewater (evcharge.online) have?
6 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates RHS Bridgewater?
RHS Bridgewater is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to RHS Bridgewater (evcharge.online)?
Novotel Manchester West Hotel (BP Pulse) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at RHS Bridgewater (evcharge.online)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at RHS Bridgewater (evcharge.online)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at RHS Bridgewater (evcharge.online)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Novotel Manchester West Hotel
- Worsley Park Marriott Hotel & Country Club
- Walkden Park & Ride
- A580 Park & Ride
- A580 Wardley Park & Ride
- Limes Service Station
- Cheapest nearby
- Walkden Park & Ride · 59p per kWh · 7 kW · 1.5 mi
- Fastest nearby
- Novotel Manchester West Hotel · 50 kW · 0.6 mi