evcharge.online · EV charging site
Southampton Science Park
1 Venture Road, Eastleigh, SO16 7NP
Southampton Science Park is an EV charging site at 1 Venture Road in Eastleigh, Hampshire, run by evcharge.online. It has a single socket, with Type 2 at up to 7 kW, and the price is listed as £0.32/kWh. Amp Map lists 2 other charge points named Southampton Science Park in Eastleigh. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is EH - Roadchef Rownhams Eastbound (GRIDSERVE), 1.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public
- Price
- £0.32/kWh(from Open Charge Map, 9 Jul 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Southampton Science Park (evcharge.online)?
The listed price is £0.32/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Southampton Science Park (evcharge.online)?
Up to 7 kW AC via Type 2.
How many charging sockets does Southampton Science Park (evcharge.online) have?
1 charging socket: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Who operates Southampton Science Park?
Southampton Science Park is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to Southampton Science Park (evcharge.online)?
EH - Roadchef Rownhams Eastbound (GRIDSERVE) is 1.2 miles away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Southampton Science Park (evcharge.online)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Southampton Science Park (evcharge.online)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Southampton Science Park (evcharge.online)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- University of Southampton Science Park
- Southampton Science Park
- Southampton Science Park
- University of Southampton Science Park
- Doubletree by Hilton Southampton
- EH - Roadchef Rownhams Eastbound
- Cheapest nearby
- EH - Roadchef Rownhams Eastbound · 59p per kWh · 350 kW · 1.2 mi
- Fastest nearby
- EH - Roadchef Rownhams Eastbound · 350 kW · 1.2 mi