evcharge.online · EV charging site
Southampton Science Park
Engineering Centre, Eastleigh, SO16 7PU
Southampton Science Park is an EV charging site at Engineering Centre in Eastleigh, Hampshire, run by evcharge.online. Both of its sockets are 22 kW Type 2, and the price is listed as £0.32/kWh. Amp Map lists 2 other charge points named Southampton Science Park in Eastleigh. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is EH - Roadchef Rownhams Eastbound (GRIDSERVE), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- evcharge.online
- Opening hours
- Not published
- Access
- Public
- Price
- £0.32/kWh(from Open Charge Map, 9 Jul 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Southampton Science Park (evcharge.online)?
The listed price is £0.32/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Southampton Science Park (evcharge.online)?
Up to 22 kW AC via Type 2.
How many charging sockets does Southampton Science Park (evcharge.online) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Southampton Science Park?
Southampton Science Park is on the evcharge.online network.
Where is the nearest charger with 50 kW or more to Southampton Science Park (evcharge.online)?
EH - Roadchef Rownhams Eastbound (GRIDSERVE) is 1.1 miles away in a straight line, with up to 350 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Southampton Science Park (evcharge.online)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Southampton Science Park (evcharge.online)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Southampton Science Park (evcharge.online)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Southampton Science Park
- Southampton Science Park
- University of Southampton Science Park
- University of Southampton Science Park
- EH - Roadchef Rownhams Eastbound
- EH - Roadchef Rownhams Westbound
- Cheapest nearby
- EH - Roadchef Rownhams Eastbound · 59p per kWh · 350 kW · 1.1 mi
- Fastest nearby
- EH - Roadchef Rownhams Eastbound · 350 kW · 1.1 mi