Evolt · EV charging site
Arbury Court Car Park - e-taxis only
Alex Wood Road, Cambridge, CB4 2EG
Arbury Court Car Park - e-taxis only is an EV charging site in Cambridge, Cambridgeshire, run by Evolt. It has a single socket, with CCS and CHAdeMO at up to 50 kW, and the price is listed as £0.25/kWh. 14 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Council Ferry Path (BP Pulse), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.25/kWh(from Open Charge Map, 1 Mar 2019)
- Phone (from Open Charge Map)
- +448082813508
- Notes
- Swarco E.Connect
- Getting there
- Access for e-taxis only
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Arbury Court Car Park - e-taxis only (Evolt)?
The listed price is £0.25/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Arbury Court Car Park - e-taxis only (Evolt)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does Arbury Court Car Park - e-taxis only (Evolt) have?
1 charging socket: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO, 2 × 43 kW Type 2.
Who operates Arbury Court Car Park - e-taxis only?
Arbury Court Car Park - e-taxis only is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to Arbury Court Car Park - e-taxis only (Evolt)?
Council Ferry Path (BP Pulse) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Arbury Court Car Park - e-taxis only (Evolt)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Arbury Court Car Park - e-taxis only (Evolt)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Arbury Court Car Park - e-taxis only (Evolt)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Allia Future Business Centre1
- Cambridge Regional College
- Council Ferry Path
- Building 406, Cambridge Science Park
- Hamilton Road
- Montague Road West - Cambridge
- Cheapest nearby
- Hamilton Road · 65p per kWh · 7 kW · 0.8 mi