Evolt · EV charging site
Dunster Steep car park
Dunster Steep car park, Minehead, ta24 6as
Dunster Steep car park is an EV charging site in Minehead, Somerset, run by Evolt. It has a single 22 kW Type 2 socket. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Alexandra Road Car Park (InstaVolt Ltd), 1.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +448082813508
- Getting there
- Located to right of car park as you drive in
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Dunster Steep car park (Evolt)?
Up to 22 kW AC via Type 2.
How many charging sockets does Dunster Steep car park (Evolt) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates Dunster Steep car park?
Dunster Steep car park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Dunster Steep car park (Evolt)?
Alexandra Road Car Park (InstaVolt Ltd) is 1.9 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Dunster Steep car park (Evolt)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Dunster Steep car park (Evolt)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Dunster Steep car park (Evolt)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Alexandra Road Car Park · 120 kW · 1.9 mi