Evolt · EV charging site
North Road car park, Minehead
North Road car park, Minehead, TA24 5AY
North Road car park, Minehead is an EV charging site in Minehead, Somerset, run by Evolt. It has a single 22 kW Type 2 socket. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Alexandra Road Car Park (InstaVolt Ltd), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +448082813508
- Getting there
- Located near disabled spaces at far end of car park.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at North Road car park, Minehead (Evolt)?
Up to 22 kW AC via Type 2.
How many charging sockets does North Road car park, Minehead (Evolt) have?
1 charging socket: 1 × 22 kW Type 2.
Who operates North Road car park, Minehead?
North Road car park, Minehead is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to North Road car park, Minehead (Evolt)?
Alexandra Road Car Park (InstaVolt Ltd) is 0.2 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at North Road car park, Minehead (Evolt)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at North Road car park, Minehead (Evolt)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at North Road car park, Minehead (Evolt)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Alexandra Road Car Park · 120 kW · 0.2 mi