Evolt · EV charging site
Hayle Marine
North Quay, Camborne, TR27 4DD
Hayle Marine is an EV charging site in Camborne, Cornwall, run by Evolt. All 16 of its sockets are 22 kW Type 2, and the price is listed as £0.56/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Shell Recharge Shell Hayle, 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Price
- £0.56/kWh(from Open Charge Map, 4 Feb 2025)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Hayle Marine (Evolt)?
The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Hayle Marine (Evolt)?
Up to 22 kW AC via Type 2.
How many charging sockets does Hayle Marine (Evolt) have?
16 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Hayle Marine?
Hayle Marine is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to Hayle Marine (Evolt)?
Shell Recharge Shell Hayle is 1.5 miles away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Hayle Marine (Evolt)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Hayle Marine (Evolt)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Hayle Marine (Evolt)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Hawkins Motors
- Shell Recharge Shell Hayle
- St Erth Multi-Modal Hub
- St Erth Multi-Modal Hub
- Pod Point Tesco Superstore - St Ives
- Pod Point Trelyon Manor
- Cheapest nearby
- Pod Point Tesco Superstore - St Ives · 44.4p per kWh · 7 kW · 2 mi
- Fastest nearby
- Shell Recharge Shell Hayle · 175 kW · 1.5 mi