Evolt · EV charging site
St Erth Multi-Modal Hub
St Erth Multi-Modal Hub, Penzance, TR27 6JW
St Erth Multi-Modal Hub is an EV charging site in Penzance, Cornwall (TR27 6JW), run by Evolt. It has a single socket, with CCS and CHAdeMO at up to 50 kW. Amp Map lists 1 other charge point named St Erth Multi-Modal Hub in Penzance. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Hayle, 2.8 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at St Erth Multi-Modal Hub (Evolt)?
Up to 50 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does St Erth Multi-Modal Hub (Evolt) have?
1 charging socket: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 1 × 22 kW Type 2.
Who operates St Erth Multi-Modal Hub?
St Erth Multi-Modal Hub is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to St Erth Multi-Modal Hub (Evolt)?
Shell Recharge Shell Hayle is 2.8 miles away in a straight line, with up to 175 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at St Erth Multi-Modal Hub (Evolt)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at St Erth Multi-Modal Hub (Evolt)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at St Erth Multi-Modal Hub (Evolt)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- St Erth Multi-Modal Hub
- Hayle Marine
- Pod Point Tesco Superstore - St Ives
- Pod Point Trelyon Manor
- Hawkins Motors
- Shell Recharge Shell Hayle
- Cheapest nearby
- Pod Point Tesco Superstore - St Ives · 44.4p per kWh · 7 kW · 2.3 mi
- Fastest nearby
- Shell Recharge Shell Hayle · 175 kW · 2.8 mi