Evolt · EV charging site
New George Street 1
New George Street, South Shields, NE33 5DU
New George Street 1 is an EV charging site in South Shields, South Tyneside, run by Evolt. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 21 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is New George Street (Evolt), 70 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at New George Street 1 (Evolt)?
Up to 50 kW DC via CHAdeMO, Type 2.
How many charging sockets does New George Street 1 (Evolt) have?
3 charging sockets: 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2, 1 × 43 kW Type 2.
Who operates New George Street 1?
New George Street 1 is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to New George Street 1 (Evolt)?
New George Street (Evolt) is 70 yards away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at New George Street 1 (Evolt)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New George Street 1 (Evolt)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at New George Street 1 (Evolt)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.