Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Evolt · EV charging site

New George Street

New George Street, South Shields, NE33 5RG

New George Street is an EV charging site in South Shields, South Tyneside, run by Evolt. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as 36p per kW. 22 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is New George Street 1 (Evolt), 70 yards away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Apr 2021Last verified 4 Apr 2021

Connectors

CCS · 50 kW1 connector
CHAdeMO · 50 kW1 connector
Type 2 · 22 kW1 connector

Site information

Operator
Evolt
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)
Price
36p per kW(from Open Charge Map, 4 Apr 2021)
Phone (from Open Charge Map)
+448082813508

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 50 kW CCS~70 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 50 kW CCS~50 min
Audi Q4 e-tron 50 10–80% · 50 kW CCS~66 min
Hyundai IONIQ 5 10–80% · 50 kW CCS~64 min
MG Motor MG4 Trophy 10–80% · 50 kW CCS~55 min
Hyundai Kona Electric Long Range 10–80% · 50 kW CCS~55 min
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at New George Street (Evolt)?

The listed price is 36p per kW. Prices can change, so check the price at the charger before you start.

How fast is charging at New George Street (Evolt)?

Up to 50 kW DC via CHAdeMO, CCS, Type 2.

How many charging sockets does New George Street (Evolt) have?

1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS, 1 × 22 kW Type 2.

Who operates New George Street?

New George Street is on the Evolt network. For site issues, the operator lists +448082813508.

Where is the nearest other charger with 50 kW or more to New George Street (Evolt)?

New George Street 1 (Evolt) is 70 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at New George Street (Evolt)?

A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at New George Street (Evolt)?

A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at New George Street (Evolt)?

A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Apr 2021

Amp Map does not take payment. You pay the operator.