Evolt · EV charging site
Ortongate Shopping Centre
Ortongate Shopping Centre, Peterborough, PE2 5TD
Ortongate Shopping Centre is an EV charging site in Peterborough, run by Evolt. Its 3 sockets reach up to 50 kW, with CHAdeMO and Type 2 at the top speed. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Ortongate Shopping Centre, Peterborough (Osprey Charging), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Ortongate Shopping Centre (Evolt)?
Up to 50 kW DC via Type 2, CHAdeMO.
How many charging sockets does Ortongate Shopping Centre (Evolt) have?
3 charging sockets: 1 × 43 kW Type 2, 1 × 50 kW CHAdeMO, 1 × 50 kW Type 2.
Who operates Ortongate Shopping Centre?
Ortongate Shopping Centre is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to Ortongate Shopping Centre (Evolt)?
Ortongate Shopping Centre, Peterborough (Osprey Charging) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Ortongate Shopping Centre (Evolt)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Ortongate Shopping Centre (Evolt)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Ortongate Shopping Centre (Evolt)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Ortongate Shopping Centre, Peterborough
- Starbucks Ortongate
- IONITY GmbH IONITY Peterborough
- Westpoint
- EH - Extra Peterborough
- Best Western Plus, Orton Hall Hotel & Spa
- Cheapest nearby
- Ortongate Shopping Centre, Peterborough · 89p per kWh · 50 kW · 0.1 mi
- Fastest nearby
- EH - Extra Peterborough · 400 kW · 1.1 mi