Zero Carbon World · EV charging site
Best Western Plus, Orton Hall Hotel & Spa
The Village, Peterborough, PE2 7DN
Best Western Plus, Orton Hall Hotel & Spa is an EV charging site in Peterborough, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is MFG BP Woodston (GeniePoint), 1 mile away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 01733 391111
- Getting there
- Two spaces in the main car park, opposite the Ramblewood Inn.
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Best Western Plus, Orton Hall Hotel & Spa (Zero Carbon World)?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Best Western Plus, Orton Hall Hotel & Spa (Zero Carbon World) have?
2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Who operates Best Western Plus, Orton Hall Hotel & Spa?
Best Western Plus, Orton Hall Hotel & Spa is on the Zero Carbon World network. For site issues, the operator lists 01733 391111.
Where is the nearest charger with 50 kW or more to Best Western Plus, Orton Hall Hotel & Spa (Zero Carbon World)?
MFG BP Woodston (GeniePoint) is 1 mile away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Best Western Plus, Orton Hall Hotel & Spa (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Best Western Plus, Orton Hall Hotel & Spa (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Best Western Plus, Orton Hall Hotel & Spa (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Beko
- MFG BP Woodston
- BP Woodston
- HU - Dobbies Peterborough
- Hampton Hub
- Pod Point Dragonfly Hotel - Peterborough
- Cheapest nearby
- Pod Point Dragonfly Hotel - Peterborough · 69.6p per kWh · 7 kW · 1.2 mi
- Fastest nearby
- HU - Dobbies Peterborough · 330 kW · 1.1 mi