Beko · EV charging site
Beko
Morley Way, Peterborough, PE2
Beko is an EV charging site in Peterborough, run by Beko and open 24 hours a day. Its 39 sockets reach up to 22 kW, with Type 2 at the top speed. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 91% uptime and recorded 572 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is BP Woodston (GeniePoint), 0.6 miles away.
Status
30 of 39 available
Checking status…
Connectors
Type 2 · 22 kW
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Beko
- Opening hours
- Open 24 hours
- Parking
- Car park
- Payment
- In the operator's appRFID card
- Charger ID
- A55 A
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Beko?
Up to 22 kW AC via Type 2.
How many charging sockets does Beko have?
39 charging sockets: 27 × 7 kW Type 2, 12 × 22 kW Type 2. Live per-socket availability is shown on this page.
Is Beko open 24/7?
Yes - Beko is open 24 hours a day, 7 days a week.
When is Beko busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 7 pm. The live status on this page shows what is free before you set off.
How reliable is Beko?
Amp Map measured 91% uptime here from recorded live status over the last 30 days, across 572 observed charging sessions.
Who operates Beko?
Beko is on the Beko network.
Where is the nearest charger with 50 kW or more to Beko?
BP Woodston (GeniePoint) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Beko?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Beko?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Beko?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- BP Woodston
- MFG BP Woodston
- Best Western Plus, Orton Hall Hotel & Spa
- HU - Dobbies Peterborough
- Hampton Hub
- Dobbies Garden Centre
- Cheapest nearby
- HU - Dobbies Peterborough · 85p per kWh · 330 kW · 0.7 mi
- Fastest nearby
- HU - Dobbies Peterborough · 330 kW · 0.7 mi