Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Beko · EV charging site

Beko

Morley Way, Peterborough, PE2

Beko is an EV charging site in Peterborough, run by Beko and open 24 hours a day. Its 39 sockets reach up to 22 kW, with Type 2 at the top speed. Recorded live status shows it is usually busiest around 9 am, and Amp Map measured 91% uptime and recorded 572 charging sessions here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is BP Woodston (GeniePoint), 0.6 miles away.

Status

30 of 39 available

Checking status…

VerifiedLive status and details from Beko’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

Type 2 · 22 kW12 connectors12 free
A55 A100% reliabilityAvailable
A55 B100% reliabilityAvailable
A58 5A100% reliabilityAvailable
A58 5B100% reliabilityAvailable
A58 6A99% reliabilityAvailable
A58 6B97% reliabilityAvailable
A58 7A100% reliabilityAvailable
A58 7B100% reliabilityAvailable
Type 2 · 7 kW27 connectors18 free3 out of service6 status unknown
A35 1A100% reliabilityAvailable
A35 1B100% reliabilityAvailable
A39 1A100% reliabilityAvailable
A39 1B0% reliabilityOut of order
A39 2A100% reliabilityAvailable
A39 2B100% reliabilityAvailable
A58 2A100% reliabilityAvailable
A58 2B100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Beko
Opening hours
Open 24 hours
Parking
Car park
Payment
In the operator's appRFID card
Charger ID
A55 A

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 22 kW Type 2~5h 2m
Tesla Model 3 Rear-Wheel Drive 10–80% · 22 kW Type 2~3h 38m
Audi Q4 e-tron 50 10–80% · 22 kW Type 2~4h 39m
Hyundai IONIQ 5 10–80% · 22 kW Type 2~4h 37m
MG Motor MG4 Trophy 10–80% · 22 kW Type 2~3h 53m
Hyundai Kona Electric Long Range 10–80% · 22 kW Type 2~5h 38m
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How fast is charging at Beko?

Up to 22 kW AC via Type 2.

How many charging sockets does Beko have?

39 charging sockets: 27 × 7 kW Type 2, 12 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Beko open 24/7?

Yes - Beko is open 24 hours a day, 7 days a week.

When is Beko busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 9 am and quietest around 7 pm. The live status on this page shows what is free before you set off.

How reliable is Beko?

Amp Map measured 91% uptime here from recorded live status over the last 30 days, across 572 observed charging sessions.

Who operates Beko?

Beko is on the Beko network.

Where is the nearest charger with 50 kW or more to Beko?

BP Woodston (GeniePoint) is 0.6 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Beko?

A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Beko?

A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Beko?

A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Beko · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.