Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Dobbies Peterborough

Phorpres Way, Peterborough, PE7 8NY

HU - Dobbies Peterborough is an EV charging site in Peterborough, run by GRIDSERVE. Its 6 sockets reach up to 330 kW, with CCS at the top speed, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 38% uptime and recorded 267 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Hampton Hub, 140 yards away.

Status

Out of service

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 330 kW4 connectors · 85p per kWhOut of service
#137% reliabilityOut of order
#235% reliabilityOut of order
#339% reliabilityOut of order
#437% reliabilityOut of order
CCS or CHAdeMO · 330 kW2 connectors · 85p per kWhOut of service
#539% reliabilityOut of order
#639% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Mon–Wed 09:00–17:45Thu 09:00–18:45Fri–Sat 09:00–17:45Sun 10:30–16:15
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

HotelRestaurantCaféShoppingBus stopFuel station

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS330 kW85p per kWh
CHAdeMO100 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 330 kW CCS~21 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 330 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 330 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 330 kW CCS~18 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 330 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 330 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Dobbies Peterborough (GRIDSERVE)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Dobbies Peterborough (GRIDSERVE)?

Up to 330 kW DC via CCS, CHAdeMO.

How many charging sockets does HU - Dobbies Peterborough (GRIDSERVE) have?

6 charging sockets: 6 × 330 kW CCS, 2 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.

When is HU - Dobbies Peterborough (GRIDSERVE) open?

Opening hours: Mon–Wed 09:00–17:45; Thu 09:00–18:45; Fri–Sat 09:00–17:45; Sun 10:30–16:15.

When is HU - Dobbies Peterborough (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 8 am. The live status on this page shows what is free before you set off.

How reliable is HU - Dobbies Peterborough (GRIDSERVE)?

Amp Map measured 38% uptime here from recorded live status over the last 30 days, across 267 observed charging sessions.

Who operates HU - Dobbies Peterborough?

HU - Dobbies Peterborough is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Dobbies Peterborough (GRIDSERVE)?

Hampton Hub is 140 yards away in a straight line, with up to 160 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Dobbies Peterborough (GRIDSERVE)?

A typical 10–80% rapid charge takes about 21 min on the 330 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Dobbies Peterborough (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 330 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Dobbies Peterborough (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 330 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.