Pod Point · EV charging site
Pod Point Dragonfly Hotel - Peterborough
Thorpe Meadows, Peterborough, PE3 6GA
Pod Point Dragonfly Hotel - Peterborough is an EV charging site in Peterborough, run by Pod Point. Both of its sockets are 7 kW Type 2, and the published price is £0.70 per kWh. Recorded live status shows it is usually busiest around 4 pm, and Amp Map measured 100% uptime and recorded 1 charging session here over the last 30 days. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Boathouse (Peterborough) (evyve), 110 yards away.
Status
1 of 2 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- Pod Point
- Opening hours
- Not published
- Payment
- In the Pod Point app
- Charger ID
- Fern-Ruby
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| Type 2 | 7 kW | 69.6p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Pod Point Dragonfly Hotel - Peterborough?
The listed price is £0.70/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Pod Point Dragonfly Hotel - Peterborough?
Up to 7 kW AC via Type 2.
How many charging sockets does Pod Point Dragonfly Hotel - Peterborough have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
When is Pod Point Dragonfly Hotel - Peterborough busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 4 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is Pod Point Dragonfly Hotel - Peterborough?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1 observed charging session.
Who operates Pod Point Dragonfly Hotel - Peterborough?
Pod Point Dragonfly Hotel - Peterborough is on the Pod Point network.
Where is the nearest charger with 50 kW or more to Pod Point Dragonfly Hotel - Peterborough?
Boathouse (Peterborough) (evyve) is 110 yards away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Pod Point Dragonfly Hotel - Peterborough?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh (~£38 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Pod Point Dragonfly Hotel - Peterborough?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh (~£28 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Pod Point Dragonfly Hotel - Peterborough?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Boathouse (Peterborough)
- MFG BP Woodston
- Quakers
- BP Woodston
- Shell Recharge Shell Westwood
- Queensgate Green Car Park
- Fastest nearby
- Shell Recharge Shell Westwood · 175 kW · 0.8 mi