Evolt · EV charging site
The Dell Car Park
Grovehill Crescent, Falmouth, TR11 4AZ
The Dell Car Park is an EV charging site in Falmouth, Cornwall, run by Evolt. All 4 of its sockets are 7 kW Type 2, and the price is listed as £0.56/kWh. 5 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Grove Place Car Park (Evolt), 0.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.56/kWh(from Open Charge Map, 27 Sept 2023)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Dell Car Park (Evolt)?
The listed price is £0.56/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at The Dell Car Park (Evolt)?
Up to 7 kW AC via Type 2.
How many charging sockets does The Dell Car Park (Evolt) have?
4 charging sockets: 2 × 7 kW Type 2, 2 × 7 kW Type 2.
Who operates The Dell Car Park?
The Dell Car Park is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest charger with 50 kW or more to The Dell Car Park (Evolt)?
Grove Place Car Park (Evolt) is 0.1 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Dell Car Park (Evolt)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Dell Car Park (Evolt)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Dell Car Park (Evolt)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Port Pendennis Village Management Ltd
- Grove Place Car Park
- Merchants Manor Gym & Swim
- Town Quarry Car Park
- Town Quarry Car Park
- Trescobeas Falmouth
- Cheapest nearby
- Pod Point Port Pendennis Village Management Ltd · 57.6p per kWh · 7 kW · 0.1 mi
- Fastest nearby
- Grove Place Car Park · 50 kW · 0.1 mi