EV charging site
Trescobeas Falmouth
Trescobeas Road, Falmouth, TR11 2JB
Trescobeas Falmouth is an EV charging site in Falmouth, Cornwall. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and the price is listed as Donation to Charity. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is McDonald's Falmouth (InstaVolt Ltd), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Private · notice required
- Price
- Donation to Charity(from Open Charge Map, 26 Jul 2015)
- Phone (from Open Charge Map)
- 01326 318399
- Getting there
- Opposite Falmouth Hospital
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Trescobeas Falmouth?
The listed price is Donation to Charity. Prices can change, so check the price at the charger before you start.
How fast is charging at Trescobeas Falmouth?
Up to 7 kW AC via BS1363 3 Pin 13 Amp, Type 2.
How many charging sockets does Trescobeas Falmouth have?
2 charging sockets: 1 × 3 kW BS1363 3 Pin 13 Amp, 1 × 7 kW Type 2.
Can anyone charge at Trescobeas Falmouth?
The operator lists this charger as private - access is restricted.
Where is the nearest charger with 50 kW or more to Trescobeas Falmouth?
McDonald's Falmouth (InstaVolt Ltd) is 0.5 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Trescobeas Falmouth?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Trescobeas Falmouth?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Trescobeas Falmouth?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- McDonald's Falmouth
- Town Quarry Car Park
- Town Quarry Car Park
- Pod Point Rosemullion Veterinary Hospital
- Pod Point Britannia Lanes
- Merchants Manor Gym & Swim
- Cheapest nearby
- Pod Point Rosemullion Veterinary Hospital · 39.6p per kWh · 7 kW · 0.6 mi
- Fastest nearby
- McDonald's Falmouth · 120 kW · 0.5 mi