InstaVolt Ltd · EV charging site
McDonald's Falmouth
Dracaena Avenue, Falmouth, TR11 2ER
McDonald's Falmouth is an EV charging site in Falmouth, Cornwall, run by InstaVolt Ltd. It has a single socket, with CCS at up to 120 kW, and the price is listed as £0.85/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Town Quarry Car Park (GeniePoint), 0.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.85/kWh(from Open Charge Map, 15 Apr 2024)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at McDonald's Falmouth (InstaVolt Ltd)?
The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at McDonald's Falmouth (InstaVolt Ltd)?
Up to 120 kW DC via CCS, CHAdeMO.
How many charging sockets does McDonald's Falmouth (InstaVolt Ltd) have?
1 charging socket: 1 × 120 kW CCS, 1 × 50 kW CHAdeMO.
Who operates McDonald's Falmouth?
McDonald's Falmouth is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to McDonald's Falmouth (InstaVolt Ltd)?
Town Quarry Car Park (GeniePoint) is 0.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at McDonald's Falmouth (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at McDonald's Falmouth (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at McDonald's Falmouth (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Trescobeas Falmouth
- Town Quarry Car Park
- Pod Point Rosemullion Veterinary Hospital
- Town Quarry Car Park
- Pod Point Britannia Lanes
- Merchants Manor Gym & Swim
- Cheapest nearby
- Pod Point Rosemullion Veterinary Hospital · 39.6p per kWh · 7 kW · 0.7 mi