Evolt · EV charging site
Westmorland Tebay Northbound Services
Westmorland Tebay Northbound Services, Kendal, CA10 3SB
Westmorland Tebay Northbound Services is an EV charging site in Kendal, Cumbria, run by Evolt. Its 6 sockets reach up to 150 kW, with CCS at the top speed, and the price is listed as DC: £0.79/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Tebay, UK (Tesla), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Evolt
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- DC: £0.79/kWh(from Open Charge Map, 9 Apr 2026)
- Phone (from Open Charge Map)
- +448082813508
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Westmorland Tebay Northbound Services (Evolt)?
The listed price is DC: £0.79/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Westmorland Tebay Northbound Services (Evolt)?
Up to 150 kW DC via CCS, CHAdeMO.
How many charging sockets does Westmorland Tebay Northbound Services (Evolt) have?
6 charging sockets: 4 × 150 kW CCS, 1 × 50 kW CHAdeMO, 6 × 104 kW CCS, 1 × 50 kW CCS.
Who operates Westmorland Tebay Northbound Services?
Westmorland Tebay Northbound Services is on the Evolt network. For site issues, the operator lists +448082813508.
Where is the nearest other charger with 50 kW or more to Westmorland Tebay Northbound Services (Evolt)?
Tebay, UK (Tesla) is 0.3 miles away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Westmorland Tebay Northbound Services (Evolt)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Westmorland Tebay Northbound Services (Evolt)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Westmorland Tebay Northbound Services (Evolt)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.