Westmorland Family · EV charging site
Tebay Services Southbound
Tebay Services Southbound, Kendal, CA10 3SB
Tebay Services Southbound is an EV charging site in Kendal, Cumbria, run by Westmorland Family. Its 4 sockets reach up to 150 kW, with CCS at the top speed, and the price is listed as £0.64/kWh. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Tebay, UK (Tesla), 10 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Westmorland Family
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.64/kWh(from Open Charge Map, 8 Apr 2026)
- Notes
- Managed by SWARCO e-Connect. Can be activated from the Evolt network app and Electroverse.
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Tebay Services Southbound (Westmorland Family)?
The listed price is £0.64/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Tebay Services Southbound (Westmorland Family)?
Up to 150 kW DC via CCS.
How many charging sockets does Tebay Services Southbound (Westmorland Family) have?
4 charging sockets: 4 × 104 kW CCS, 4 × 150 kW CCS.
Who operates Tebay Services Southbound?
Tebay Services Southbound is on the Westmorland Family network.
Where is the nearest other charger with 50 kW or more to Tebay Services Southbound (Westmorland Family)?
Tebay, UK (Tesla) is 10 yards away in a straight line, with up to 250 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Tebay Services Southbound (Westmorland Family)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Tebay Services Southbound (Westmorland Family)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Tebay Services Southbound (Westmorland Family)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.