Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

evyve · EV charging site

Middlemarch Farm (Nuneaton)

St Davids Way, Bedworth, CV10 7SD

Middlemarch Farm (Nuneaton) is an EV charging site in Bedworth, Warwickshire, run by evyve and open 24 hours a day. All 8 of its sockets are 300 kW CCS, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 11 am, and Amp Map measured 98% uptime and recorded 639 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Holiday Inn Nuneaton (BP Pulse), 80 yards away.

Status

8 of 8 available

Checking status…

VerifiedLive status and details from evyve’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 300 kW8 connectors · 85p per kWh8 free
Middlemarch 01-A100% reliabilityAvailable
Middlemarch 01-B99% reliabilityAvailable
Middlemarch 02-A98% reliabilityAvailable
Middlemarch 02-B89% reliabilityAvailable
Middlemarch 03-A100% reliabilityAvailable
Middlemarch 03-B100% reliabilityAvailable
Middlemarch 04-A98% reliabilityAvailable
Middlemarch 04-B100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
evyve
Opening hours
Open 24 hours
Payment
Bank card at the chargerIn the evyve Charge appRFID card
Charger ID
Middlemarch 01-A

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS300 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 300 kW CCS~21 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 300 kW CCS~23 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 300 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 300 kW CCS~18 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 300 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 300 kW CCS~39 min · ≈ 41 kWh · ~£35

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Middlemarch Farm (Nuneaton) (evyve)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Middlemarch Farm (Nuneaton) (evyve)?

Up to 300 kW DC via CCS.

How many charging sockets does Middlemarch Farm (Nuneaton) (evyve) have?

8 charging sockets: 8 × 300 kW CCS. Live per-socket availability is shown on this page.

Is Middlemarch Farm (Nuneaton) (evyve) open 24/7?

Yes - Middlemarch Farm (Nuneaton) (evyve) is open 24 hours a day, 7 days a week.

When is Middlemarch Farm (Nuneaton) (evyve) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 11 am and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is Middlemarch Farm (Nuneaton) (evyve)?

Amp Map measured 98% uptime here from recorded live status over the last 30 days, across 639 observed charging sessions.

Who operates Middlemarch Farm (Nuneaton)?

Middlemarch Farm (Nuneaton) is on the evyve network.

Where is the nearest other charger with 50 kW or more to Middlemarch Farm (Nuneaton) (evyve)?

Holiday Inn Nuneaton (BP Pulse) is 80 yards away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Middlemarch Farm (Nuneaton) (evyve)?

A typical 10–80% rapid charge takes about 21 min on the 300 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Middlemarch Farm (Nuneaton) (evyve)?

A typical 10–80% rapid charge takes about 23 min on the 300 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Middlemarch Farm (Nuneaton) (evyve)?

A typical 10–80% rapid charge takes about 39 min on the 300 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: evyve · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.