InstaVolt Ltd · EV charging site
McDonald's, Bermuda Park
St David's Way, Bedworth, CV10 7SD
McDonald's, Bermuda Park is an EV charging site in Bedworth, Warwickshire, run by InstaVolt Ltd. It has a single socket, with CCS at up to 120 kW, and the price is listed as £0.75/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Middlemarch Farm (Nuneaton) (evyve), 90 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at McDonald's, Bermuda Park (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at McDonald's, Bermuda Park (InstaVolt Ltd)?
Up to 120 kW DC via CCS, CHAdeMO.
How many charging sockets does McDonald's, Bermuda Park (InstaVolt Ltd) have?
1 charging socket: 1 × 120 kW CCS, 1 × 100 kW CHAdeMO.
Who operates McDonald's, Bermuda Park?
McDonald's, Bermuda Park is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to McDonald's, Bermuda Park (InstaVolt Ltd)?
Middlemarch Farm (Nuneaton) (evyve) is 90 yards away in a straight line, with up to 300 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at McDonald's, Bermuda Park (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at McDonald's, Bermuda Park (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at McDonald's, Bermuda Park (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Middlemarch Farm (Nuneaton)
- Holiday Inn Nuneaton
- Griffin, Nuneaton
- IDIADA bp pulse (PRIVATE)
- Pod Point Tesco Extra - Bedworth
- Attleborough Arms, Nuneaton
- Cheapest nearby
- Pod Point Tesco Extra - Bedworth · 44.4p per kWh · 7 kW · 1.2 mi
- Fastest nearby
- Middlemarch Farm (Nuneaton) · 300 kW · 90 yd