evyve · EV charging site
Woodfield Farm (Balby)
Bullrush Grove, Doncaster, DN4 8SJ
Woodfield Farm (Balby) is an EV charging site in Doncaster, run by evyve and open Mon–Sun 08:00–22:00. All 8 of its sockets are 150 kW CCS, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 3 pm, and Amp Map measured 100% uptime and recorded 1284 charging sessions here over the last 30 days. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Starbucks (InstaVolt Ltd), 0.1 miles away.
Status
8 of 8 available
Checking status…
Connectors
CCS · 150 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- evyve
- Opening hours
- Mon–Sun 08:00–22:00
- Payment
- Bank card at the chargerIn the evyve Charge appRFID card
- Charger ID
- Farm 01-A
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 150 kW | 85p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Woodfield Farm (Balby) (evyve)?
The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Woodfield Farm (Balby) (evyve)?
Up to 150 kW DC via CCS.
How many charging sockets does Woodfield Farm (Balby) (evyve) have?
8 charging sockets: 8 × 150 kW CCS. Live per-socket availability is shown on this page.
When is Woodfield Farm (Balby) (evyve) open?
Opening hours: Mon–Sun 08:00–22:00.
When is Woodfield Farm (Balby) (evyve) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 3 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is Woodfield Farm (Balby) (evyve)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 1284 observed charging sessions.
Who operates Woodfield Farm (Balby)?
Woodfield Farm (Balby) is on the evyve network.
Where is the nearest other charger with 50 kW or more to Woodfield Farm (Balby) (evyve)?
Starbucks (InstaVolt Ltd) is 0.1 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Woodfield Farm (Balby) (evyve)?
A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Woodfield Farm (Balby) (evyve)?
A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Woodfield Farm (Balby) (evyve)?
A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Starbucks
- The Highfield Group
- Pod Point Tesco Extra - Doncaster
- Instavolt Plantation Road
- Opal Centre
- Tickhill Road Hospital
- Cheapest nearby
- Pod Point Tesco Extra - Doncaster · 44.4p per kWh · 7 kW · 0.8 mi