InstaVolt Ltd · EV charging site
Instavolt Plantation Road
Plantation Road, Doncaster, DN4 8SN
Instavolt Plantation Road is an EV charging site in Doncaster, run by InstaVolt Ltd. Both of its sockets are 120 kW CCS and CHAdeMO, and the price is listed as £0.75/kWh. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Starbucks (InstaVolt Ltd), 0.9 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Instavolt Plantation Road (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Instavolt Plantation Road (InstaVolt Ltd)?
Up to 120 kW DC via CCS, CHAdeMO.
How many charging sockets does Instavolt Plantation Road (InstaVolt Ltd) have?
2 charging sockets: 2 × 120 kW CCS, 2 × 120 kW CHAdeMO.
Who operates Instavolt Plantation Road?
Instavolt Plantation Road is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Instavolt Plantation Road (InstaVolt Ltd)?
Starbucks (InstaVolt Ltd) is 0.9 miles away in a straight line, with up to 120 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Instavolt Plantation Road (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Instavolt Plantation Road (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Instavolt Plantation Road (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Pod Point Tesco Extra - Doncaster
- Opal Centre
- Tickhill Road Hospital
- Starbucks
- Woodfield Farm (Balby)
- Lidl
- Cheapest nearby
- Pod Point Tesco Extra - Doncaster · 44.4p per kWh · 7 kW · 0.1 mi
- Fastest nearby
- Woodfield Farm (Balby) · 150 kW · 0.9 mi