Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

FOR EV · EV charging site

Forth Ports - Newhaven - 0109

Newhaven Place, Edinburgh, EH6 4TW

Forth Ports - Newhaven - 0109 is an EV charging site in Edinburgh, City of Edinburgh, run by FOR EV and open 24 hours a day. Its 4 sockets reach up to 75 kW, with CCS at the top speed, and the published price is £0.76 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 324 charging sessions here over the last 30 days. 5 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Edinburgh, Ocean Terminal (Source EV), 0.6 miles away.

Status

4 of 4 available

Checking status…

VerifiedLive status and details from FOR EV’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 75 kW3 connectors · 76p per kWh3 free
FORTH-2-CCS100% reliabilityAvailable
FORTH-3-CCS100% reliabilityAvailable
FORTH-4-CCS100% reliabilityAvailable
CHAdeMO · 50 kW1 connector · 76p per kWh1 free
FORTH-1-CHA100% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
FOR EV
Opening hours
Open 24 hours
Parking
Car park
Payment
Contactless card at the chargerIn the FOR EV appRFID card
Charger ID
FORTH-1-CHA

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS75 kW76p per kWh
CHAdeMO50 kW76p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 75 kW CCS~47 min · ≈ 55 kWh · ~£42
Tesla Model 3 Rear-Wheel Drive 10–80% · 75 kW CCS~35 min · ≈ 40 kWh · ~£30
Audi Q4 e-tron 50 10–80% · 75 kW CCS~49 min · ≈ 51 kWh · ~£39
Hyundai IONIQ 5 10–80% · 75 kW CCS~43 min · ≈ 51 kWh · ~£39
MG Motor MG4 Trophy 10–80% · 75 kW CCS~40 min · ≈ 43 kWh · ~£32
Hyundai Kona Electric Long Range 10–80% · 75 kW CCS~43 min · ≈ 41 kWh · ~£31
Nissan LEAF 10–80% · 50 kW CHAdeMO~55 min · ≈ 28 kWh · ~£21

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Forth Ports - Newhaven - 0109 (FOR EV)?

The listed price is £0.76/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Forth Ports - Newhaven - 0109 (FOR EV)?

Up to 75 kW DC via CHAdeMO, CCS.

How many charging sockets does Forth Ports - Newhaven - 0109 (FOR EV) have?

4 charging sockets: 1 × 50 kW CHAdeMO, 3 × 75 kW CCS. Live per-socket availability is shown on this page.

Is Forth Ports - Newhaven - 0109 (FOR EV) open 24/7?

Yes - Forth Ports - Newhaven - 0109 (FOR EV) is open 24 hours a day, 7 days a week.

When is Forth Ports - Newhaven - 0109 (FOR EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Forth Ports - Newhaven - 0109 (FOR EV)?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 324 observed charging sessions.

Who operates Forth Ports - Newhaven - 0109?

Forth Ports - Newhaven - 0109 is on the FOR EV network.

Where is the nearest other charger with 50 kW or more to Forth Ports - Newhaven - 0109 (FOR EV)?

Edinburgh, Ocean Terminal (Source EV) is 0.6 miles away in a straight line, with up to 160 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Forth Ports - Newhaven - 0109 (FOR EV)?

A typical 10–80% rapid charge takes about 47 min on the 75 kW CCS here, adding roughly 55 kWh (~£42 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Forth Ports - Newhaven - 0109 (FOR EV)?

A typical 10–80% rapid charge takes about 35 min on the 75 kW CCS here, adding roughly 40 kWh (~£30 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Forth Ports - Newhaven - 0109 (FOR EV)?

A typical 10–80% rapid charge takes about 49 min on the 75 kW CCS here, adding roughly 51 kWh (~£39 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: FOR EV · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.