Fuuse · EV charging site
Helen Browning's Royal Oak
Cues Lane, Swindon, SN6 8PP
Helen Browning's Royal Oak is an EV charging site in Swindon, Borough of Swindon, run by Fuuse. Its 3 sockets reach up to 22 kW, with Type 2 at the top speed, and the price is listed as £0.35/kWh. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Morrisons Swindon Dorcan (MFG EV Power), 3.7 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Price
- £0.35/kWh(from Open Charge Map, 30 May 2023)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Helen Browning's Royal Oak (Fuuse)?
The listed price is £0.35/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Helen Browning's Royal Oak (Fuuse)?
Up to 22 kW AC via Type 2.
How many charging sockets does Helen Browning's Royal Oak (Fuuse) have?
3 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 7 kW Type 2.
Who operates Helen Browning's Royal Oak?
Helen Browning's Royal Oak is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest charger with 50 kW or more to Helen Browning's Royal Oak (Fuuse)?
Morrisons Swindon Dorcan (MFG EV Power) is 3.7 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Helen Browning's Royal Oak (Fuuse)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Helen Browning's Royal Oak (Fuuse)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Helen Browning's Royal Oak (Fuuse)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Three Trees Farm Shop and Cafe · 120 kW · 4.2 mi