Fuuse · EV charging site
Morton Manor Community Centre
Wigton Road, Carlisle, CA2 6JW
Morton Manor Community Centre is an EV charging site in Carlisle, Cumbria, run by Fuuse. It has a single socket, with Type 2 at up to 22 kW, and the price is listed as £0.59/kWh. 4 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Lowther Street (GeniePoint), 1.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Price
- £0.59/kWh(from Open Charge Map, 5 Apr 2026)
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Morton Manor Community Centre (Fuuse)?
The listed price is £0.59/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Morton Manor Community Centre (Fuuse)?
Up to 22 kW AC via Type 2.
How many charging sockets does Morton Manor Community Centre (Fuuse) have?
1 charging socket: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Morton Manor Community Centre?
Morton Manor Community Centre is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest charger with 50 kW or more to Morton Manor Community Centre (Fuuse)?
Lowther Street (GeniePoint) is 1.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Morton Manor Community Centre (Fuuse)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Morton Manor Community Centre (Fuuse)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Morton Manor Community Centre (Fuuse)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.