Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Fuuse · EV charging site

Starbucks A1 J34

Blyth Road, Dinnington, S81 8FH

Starbucks A1 J34 is an EV charging site in Dinnington, Rotherham, run by Fuuse. It has a single socket, with CCS and CHAdeMO at up to 52 kW, and the price is listed as £0.65/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is EH - MOTO Blyth (GRIDSERVE), 0.2 miles away.

Status

No live status

We don't have live status for this charger. Check it when you arrive.

Community dataThird-party data from Open Charge Map contributors. It may be out of date or inaccurate - check with the operator before relying on it.Last verified 4 Mar 2024Last verified 4 Mar 2024

Connectors

CCS · 52 kW1 connector
CHAdeMO · 52 kW1 connector

Site information

Operator
Fuuse
Opening hours
Not published
Access
Public
Payment
Pay at the charger (from Open Charge Map)
Price
£0.65/kWh(from Open Charge Map, 4 Mar 2024)
Phone (from Open Charge Map)
+44 333 050 4950

Always check directly with the charge point operator for the most up-to-date information.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 52 kW CCS~67 min
Tesla Model 3 Rear-Wheel Drive 10–80% · 52 kW CCS~49 min
Audi Q4 e-tron 50 10–80% · 52 kW CCS~64 min
Hyundai IONIQ 5 10–80% · 52 kW CCS~62 min
MG Motor MG4 Trophy 10–80% · 52 kW CCS~53 min
Hyundai Kona Electric Long Range 10–80% · 52 kW CCS~54 min
Nissan LEAF 10–80% · 52 kW CHAdeMO~54 min

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Starbucks A1 J34 (Fuuse)?

The listed price is £0.65/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Starbucks A1 J34 (Fuuse)?

Up to 52 kW DC via CCS, CHAdeMO.

How many charging sockets does Starbucks A1 J34 (Fuuse) have?

1 charging socket: 1 × 52 kW CCS, 1 × 52 kW CHAdeMO.

Who operates Starbucks A1 J34?

Starbucks A1 J34 is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.

Where is the nearest other charger with 50 kW or more to Starbucks A1 J34 (Fuuse)?

EH - MOTO Blyth (GRIDSERVE) is 0.2 miles away in a straight line, with up to 400 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Starbucks A1 J34 (Fuuse)?

A typical 10–80% rapid charge takes about 67 min on the 52 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Starbucks A1 J34 (Fuuse)?

A typical 10–80% rapid charge takes about 49 min on the 52 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Starbucks A1 J34 (Fuuse)?

A typical 10–80% rapid charge takes about 64 min on the 52 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.

Data: Open Charge Map · verified 4 Mar 2024

Amp Map does not take payment. You pay the operator.