Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Be.EV · EV charging site

Market Place Doncaster

Market Place, High Street, Maltby, DN10 6JL

Market Place Doncaster is an EV charging site in Maltby, Rotherham, run by Be.EV and open 24 hours a day. Its 6 sockets reach up to 60 kW, with CCS at the top speed, and published prices run from £0.59 to £0.84 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 67% uptime and recorded 251 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is Starbucks A1 J34 (Fuuse), 3.3 miles away.

Status

4 of 6 available

Checking status…

VerifiedLive status and details from Be.EV’s data feed. Amp Map updates them automatically.Last synced 21 Nov 2026

Connectors

CCS · 60 kW4 connectors · 84p per kWh4 free
PA0040-1100% reliabilityAvailable
PA0040-2100% reliabilityAvailable
PA0041-1100% reliabilityAvailable
PA0041-2100% reliabilityAvailable
Type 2 · 22 kW2 connectors · 59p per kWhOut of service
AD01073-10% reliabilityOut of order
AD01073-20% reliabilityOut of order

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
Be.EV
Opening hours
Open 24 hours
Parking
Car park
Payment
In the Be.EV app
Charger ID
PA0040-1

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS60 kW84p per kWh
Type 222 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 60 kW CCS~58 min · ≈ 55 kWh · ~£46
Tesla Model 3 Rear-Wheel Drive 10–80% · 60 kW CCS~43 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 60 kW CCS~57 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 60 kW CCS~53 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 60 kW CCS~47 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 60 kW CCS~49 min · ≈ 41 kWh · ~£34
Nissan LEAF 10–80% · 22 kW Type 2~4h 15m · ≈ 28 kWh · ~£17

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Market Place Doncaster (Be.EV)?

The listed price is CCS £0.84/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Market Place Doncaster (Be.EV)?

Up to 60 kW DC via CCS, Type 2.

How many charging sockets does Market Place Doncaster (Be.EV) have?

6 charging sockets: 4 × 60 kW CCS, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

Is Market Place Doncaster (Be.EV) open 24/7?

Yes - Market Place Doncaster (Be.EV) is open 24 hours a day, 7 days a week.

When is Market Place Doncaster (Be.EV) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Market Place Doncaster (Be.EV)?

Amp Map measured 67% uptime here from recorded live status over the last 30 days, across 251 observed charging sessions.

Who operates Market Place Doncaster?

Market Place Doncaster is on the Be.EV network.

Where is the nearest other charger with 50 kW or more to Market Place Doncaster (Be.EV)?

Starbucks A1 J34 (Fuuse) is 3.3 miles away in a straight line, with up to 52 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Market Place Doncaster (Be.EV)?

A typical 10–80% rapid charge takes about 58 min on the 60 kW CCS here, adding roughly 55 kWh (~£46 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Market Place Doncaster (Be.EV)?

A typical 10–80% rapid charge takes about 43 min on the 60 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Market Place Doncaster (Be.EV)?

A typical 10–80% rapid charge takes about 57 min on the 60 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Be.EV · synced 21 Nov 2026

Amp Map does not take payment. You pay the operator.