Zero Carbon World · EV charging site
Best Western Mount Pleasant
Great North Road, Doncaster, DN11 0HW
Best Western Mount Pleasant is an EV charging site in Doncaster, run by Zero Carbon World. Its 2 sockets reach up to 7 kW, with Type 2 at the top speed, and charging is listed as free. 1 other charging site is listed within a mile, and the nearest site with 50 kW or more is Lidl New Rossington, 2.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 9 May 2019)
- Phone (from Open Charge Map)
- 01302 868696
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Best Western Mount Pleasant (Zero Carbon World)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at Best Western Mount Pleasant (Zero Carbon World)?
Up to 7 kW AC via Type 2, BS1363 3 Pin 13 Amp.
How many charging sockets does Best Western Mount Pleasant (Zero Carbon World) have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 3 kW BS1363 3 Pin 13 Amp.
Who operates Best Western Mount Pleasant?
Best Western Mount Pleasant is on the Zero Carbon World network. For site issues, the operator lists 01302 868696.
Where is the nearest charger with 50 kW or more to Best Western Mount Pleasant (Zero Carbon World)?
Lidl New Rossington is 2.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Best Western Mount Pleasant (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Best Western Mount Pleasant (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Best Western Mount Pleasant (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Doncaster South - Parrot’s Corner Park & Ride 1
- Avro Park
- Harbon Charging Solutions
- Lidl New Rossington
- Toby Carvery Bessacarr
- Jet Petrol Station Doncaster
- Cheapest nearby
- Toby Carvery Bessacarr · 89p per kWh · 50 kW · 2.3 mi
- Fastest nearby
- Lidl New Rossington · 50 kW · 2.2 mi