MFG EV Power · EV charging site
Jet Petrol Station Doncaster
Cantley Lane, Doncaster, DN4 6NN
Jet Petrol Station Doncaster is an EV charging site in Doncaster, run by MFG EV Power. It has a single 50 kW CCS socket. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Toby Carvery Bessacarr (BP Pulse), 0.5 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- MFG EV Power
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 20 8515 8559
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Jet Petrol Station Doncaster (MFG EV Power)?
Up to 50 kW DC via CCS.
How many charging sockets does Jet Petrol Station Doncaster (MFG EV Power) have?
1 charging socket: 1 × 50 kW CCS.
Who operates Jet Petrol Station Doncaster?
Jet Petrol Station Doncaster is on the MFG EV Power network. For site issues, the operator lists +44 20 8515 8559.
Where is the nearest other charger with 50 kW or more to Jet Petrol Station Doncaster (MFG EV Power)?
Toby Carvery Bessacarr (BP Pulse) is 0.5 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Jet Petrol Station Doncaster (MFG EV Power)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Jet Petrol Station Doncaster (MFG EV Power)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Jet Petrol Station Doncaster (MFG EV Power)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Toby Carvery Bessacarr
- Doncaster South - Parrot’s Corner Park & Ride 1
- The Highfield Group
- Lidl New Rossington
- Woodfield Farm (Balby)
- Harbon Charging Solutions
- Cheapest nearby
- Woodfield Farm (Balby) · 85p per kWh · 150 kW · 2 mi
- Fastest nearby
- Woodfield Farm (Balby) · 150 kW · 2 mi