Fuuse · EV charging site
The Melbreak Hotel
Winscales Rd, Workington, CA14 1XS
The Melbreak Hotel is an EV charging site in Workington, Cumbria, run by Fuuse. Both of its sockets are 7 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Workington - Allerdale Borough Council (GeniePoint), 3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Fuuse
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- +44 333 050 4950
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Melbreak Hotel (Fuuse)?
Up to 7 kW AC via Type 2.
How many charging sockets does The Melbreak Hotel (Fuuse) have?
2 charging sockets: 6 × 7 kW Type 2.
Who operates The Melbreak Hotel?
The Melbreak Hotel is on the Fuuse network. For site issues, the operator lists +44 333 050 4950.
Where is the nearest charger with 50 kW or more to The Melbreak Hotel (Fuuse)?
Workington - Allerdale Borough Council (GeniePoint) is 3 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Melbreak Hotel (Fuuse)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Melbreak Hotel (Fuuse)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Melbreak Hotel (Fuuse)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Energus
- Community Diagnostics Centre
- Workington - Allerdale Borough Council
- Lakes College
- EG Group EG Lillyhall
- Fastest nearby
- EG Group EG Lillyhall · 175 kW · 3.6 mi