EV charging site
Gmlc
Geoff Moulder Leisure Centre, Boston, PE21 6JE
Gmlc is an EV charging site in Boston, Lincolnshire. Both of its sockets are 7 kW Type 2. 6 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Co-op Skirbeck Road (BP Pulse), 0.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Gmlc?
Up to 7 kW AC via Type 2.
How many charging sockets does Gmlc have?
2 charging sockets: 1 × 7 kW Type 2, 1 × 7 kW Type 2.
Where is the nearest charger with 50 kW or more to Gmlc?
Co-op Skirbeck Road (BP Pulse) is 0.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Gmlc?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Gmlc?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Gmlc?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- Co-op Skirbeck Road · 50 kW · 0.2 mi