Go Zero · EV charging site
The Greenway Hotel and Spa, Cheltenham ( Eden Hotels)
The Greenway Hotel and Spa, Cheltenham, GL51 4UG
The Greenway Hotel and Spa, Cheltenham ( Eden Hotels) is an EV charging site in Cheltenham, Gloucestershire, run by Go Zero. All 8 of its sockets are 22 kW Type 2. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Primrose Vale Farm Shop, Bentham (Osprey Charging), 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Go Zero
- Opening hours
- Not published
- Access
- Public · membership required · access key required
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Greenway Hotel and Spa, Cheltenham ( Eden Hotels) (Go Zero)?
Up to 22 kW AC via Type 2.
How many charging sockets does The Greenway Hotel and Spa, Cheltenham ( Eden Hotels) (Go Zero) have?
8 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates The Greenway Hotel and Spa, Cheltenham ( Eden Hotels)?
The Greenway Hotel and Spa, Cheltenham ( Eden Hotels) is on the Go Zero network.
Where is the nearest charger with 50 kW or more to The Greenway Hotel and Spa, Cheltenham ( Eden Hotels) (Go Zero)?
Primrose Vale Farm Shop, Bentham (Osprey Charging) is 1.1 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Greenway Hotel and Spa, Cheltenham ( Eden Hotels) (Go Zero)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Greenway Hotel and Spa, Cheltenham ( Eden Hotels) (Go Zero)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Greenway Hotel and Spa, Cheltenham ( Eden Hotels) (Go Zero)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Primrose Vale Farm Shop, Bentham
- Morrisons
- National Star
- Premier inn Gloucester (Little Witcombe)
- Main School
- Arle Court Park & Ride
- Cheapest nearby
- Primrose Vale Farm Shop, Bentham · 89p per kWh · 150 kW · 1.1 mi
- Fastest nearby
- Primrose Vale Farm Shop, Bentham · 150 kW · 1.1 mi