Zero Carbon World · EV charging site
National Star
Ullenwood Manor Road, Cheltenham, GL53 9QU
National Star is an EV charging site in Cheltenham, Gloucestershire, run by Zero Carbon World. It has a single 7 kW Type 2 socket, and the price is listed as Free for visitors to the centre only. No other charging site is listed within a mile, and the nearest site with 50 kW or more is Clock Tower, Cheltenham (Osprey Charging), 2.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Customers only
- Price
- Free for visitors to the centre only(from Open Charge Map, 30 Jul 2019)
- Phone (from Open Charge Map)
- 01242 527631
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at National Star (Zero Carbon World)?
The listed price is Free for visitors to the centre only. Prices can change, so check the price at the charger before you start.
How fast is charging at National Star (Zero Carbon World)?
Up to 7 kW AC via Type 2.
How many charging sockets does National Star (Zero Carbon World) have?
1 charging socket: 1 × 7 kW Type 2.
Who operates National Star?
National Star is on the Zero Carbon World network. For site issues, the operator lists 01242 527631.
Can anyone charge at National Star (Zero Carbon World)?
The operator lists this charger for customers of the site.
Where is the nearest charger with 50 kW or more to National Star (Zero Carbon World)?
Clock Tower, Cheltenham (Osprey Charging) is 2.2 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at National Star (Zero Carbon World)?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at National Star (Zero Carbon World)?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at National Star (Zero Carbon World)?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Greenway Hotel and Spa, Cheltenham ( Eden Hotels)
- Cowley Manor
- Clock Tower, Cheltenham
- Primrose Vale Farm Shop, Bentham
- Morrisons
- Premier inn Gloucester (Little Witcombe)
- Cheapest nearby
- Clock Tower, Cheltenham · 89p per kWh · 50 kW · 2.2 mi
- Fastest nearby
- Primrose Vale Farm Shop, Bentham · 150 kW · 2.3 mi