GRIDSERVE · EV charging site
EH - MOTO Grantham North
A1, Grantham, NG32 2AB
EH - MOTO Grantham North is an EV charging site in Grantham, Lincolnshire, run by GRIDSERVE and open 24 hours a day. Its 29 sockets reach up to 360 kW, with CCS at the top speed, and published prices run from £0.59 to £0.92 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 100% uptime and recorded 3292 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is Grantham, UK (Tesla), 50 yards away.
Status
24 of 29 available
Checking status…
Connectors
CCS · 360 kW
CCS · 350 kW
CCS or CHAdeMO · 350 kW
CHAdeMO · 50 kW
CCS · 45 kW
Type 2 · 11 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 360 kW | 92p per kWh |
| CCS | 350 kW | 92p per kWh |
| CHAdeMO | 100 kW | 92p per kWh |
| CHAdeMO | 50 kW | 92p per kWh |
| CCS | 45 kW | 92p per kWh |
| Type 2 | 11 kW | 59p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at EH - MOTO Grantham North (GRIDSERVE)?
The listed price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · CCS £0.92/kWh · CHAdeMO £0.92/kWh · Type 2 £0.59/kWh · CCS £0.92/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at EH - MOTO Grantham North (GRIDSERVE)?
Up to 360 kW DC via CCS, CHAdeMO, Type 2.
How many charging sockets does EH - MOTO Grantham North (GRIDSERVE) have?
29 charging sockets: 3 × 45 kW CCS, 1 × 50 kW CHAdeMO, 12 × 350 kW CCS, 6 × 100 kW CHAdeMO, 1 × 11 kW Type 2, 12 × 360 kW CCS. Live per-socket availability is shown on this page.
Is EH - MOTO Grantham North (GRIDSERVE) open 24/7?
Yes - EH - MOTO Grantham North (GRIDSERVE) is open 24 hours a day, 7 days a week.
When is EH - MOTO Grantham North (GRIDSERVE) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.
How reliable is EH - MOTO Grantham North (GRIDSERVE)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 3292 observed charging sessions.
Who operates EH - MOTO Grantham North?
EH - MOTO Grantham North is on the GRIDSERVE network.
Where is the nearest other charger with 50 kW or more to EH - MOTO Grantham North (GRIDSERVE)?
Grantham, UK (Tesla) is 50 yards away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EH - MOTO Grantham North (GRIDSERVE)?
A typical 10–80% rapid charge takes about 21 min on the 360 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Grantham North (GRIDSERVE)?
A typical 10–80% rapid charge takes about 23 min on the 360 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Grantham North (GRIDSERVE)?
A typical 10–80% rapid charge takes about 39 min on the 360 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Grantham, UK
- EVC Belton Woods Hotel, Spa & Golf Resort
- Miller & Carter Grantham
- The Avenue Hotel
- Welham St Car Park, Grantham
- Grantham EV Hub
- Cheapest nearby
- Grantham, UK · 58p per kWh · 150 kW · 50 yd