The Avenue Hotel · EV charging site
The Avenue Hotel
32-34 Avenue Rd, Grantham, NG31 6TH
The Avenue Hotel is an EV charging site in Grantham, Lincolnshire, run by The Avenue Hotel and open 24 hours a day. Both of its sockets are 7 kW Type 2. Amp Map measured 100% uptime here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Discovery Retail Park - Grantham (InstaVolt Ltd), 0.4 miles away.
Status
2 of 2 available
Checking status…
Connectors
Type 2 · 7 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- The Avenue Hotel
- Opening hours
- Open 24 hours
- Payment
- In the operator's appRFID card
- Charger ID
- - Charger 1
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at The Avenue Hotel?
Up to 7 kW AC via Type 2.
How many charging sockets does The Avenue Hotel have?
2 charging sockets: 2 × 7 kW Type 2. Live per-socket availability is shown on this page.
Is The Avenue Hotel open 24/7?
Yes - The Avenue Hotel is open 24 hours a day, 7 days a week.
How reliable is The Avenue Hotel?
Amp Map measured 100% uptime here from recorded live status over the last 30 days.
Who operates The Avenue Hotel?
The Avenue Hotel is on the The Avenue Hotel network.
Where is the nearest charger with 50 kW or more to The Avenue Hotel?
Discovery Retail Park - Grantham (InstaVolt Ltd) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Avenue Hotel?
A 10–80% charge takes about 7h 54m on the 7 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Avenue Hotel?
A 10–80% charge takes about 5h 42m on the 7 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Avenue Hotel?
A 10–80% charge takes about 7h 18m on the 7 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Welham St Car Park, Grantham
- Discovery Retail Park - Grantham
- Grantham EV Hub
- Miller & Carter Grantham
- EVC Belton Woods Hotel, Spa & Golf Resort
- EH - MOTO Grantham North
- Cheapest nearby
- EH - MOTO Grantham North · 59p per kWh · 360 kW · 3 mi
- Fastest nearby
- EH - MOTO Grantham North · 360 kW · 3 mi