GRIDSERVE Electric Freightway · EV charging site
eHGV - MOTO Exeter
Moor lane, Heavitree, EX2 7HF
eHGV - MOTO Exeter is an EV charging site in Heavitree, Devon, run by GRIDSERVE Electric Freightway and open 24 hours a day. Its 10 sockets reach up to 350 kW, with CCS at the top speed, and the published price is £0.89 per kWh. Recorded live status shows it is usually busiest around 11 pm, and Amp Map measured 100% uptime and recorded 15 charging sessions here over the last 30 days. 31 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is MOT4400419 (Moto Hospitality), 0.1 miles away.
Status
10 of 10 available
Checking status…
Connectors
CCS · 350 kW
CHAdeMO · 100 kW
Reliability is the share of time each socket was not out of order, over the last 30 days.
Site information
- Operator
- GRIDSERVE Electric Freightway
- Opening hours
- Open 24 hours
- Parking
- On-street
- Payment
- Bank card at the chargerIn the GRIDSERVE appRFID card
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Prices
| Connector | Power | Price |
|---|---|---|
| CCS | 350 kW | 89p per kWh |
| CHAdeMO | 100 kW | 89p per kWh |
Price at the charger, including VAT. Paying in the operator's app may cost less.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?
The listed price is £0.89/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?
Up to 350 kW DC via CCS, CHAdeMO.
How many charging sockets does eHGV - MOTO Exeter (GRIDSERVE Electric Freightway) have?
10 charging sockets: 9 × 350 kW CCS, 1 × 100 kW CHAdeMO. Live per-socket availability is shown on this page.
Is eHGV - MOTO Exeter (GRIDSERVE Electric Freightway) open 24/7?
Yes - eHGV - MOTO Exeter (GRIDSERVE Electric Freightway) is open 24 hours a day, 7 days a week.
When is eHGV - MOTO Exeter (GRIDSERVE Electric Freightway) busiest?
Measured from recorded socket occupancy across the week, it is typically busiest around 11 pm and quietest around 6 am. The live status on this page shows what is free before you set off.
How reliable is eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?
Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 15 observed charging sessions.
Who operates eHGV - MOTO Exeter?
eHGV - MOTO Exeter is on the GRIDSERVE Electric Freightway network.
Where is the nearest other charger with 50 kW or more to eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?
MOT4400419 (Moto Hospitality) is 0.1 miles away in a straight line, with up to 400 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?
A typical 10–80% rapid charge takes about 21 min on the 350 kW CCS here, adding roughly 55 kWh (~£49 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?
A typical 10–80% rapid charge takes about 23 min on the 350 kW CCS here, adding roughly 40 kWh (~£36 at the published price). Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at eHGV - MOTO Exeter (GRIDSERVE Electric Freightway)?
A typical 10–80% rapid charge takes about 39 min on the 350 kW CCS here, adding roughly 51 kWh (~£45 at the published price). Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Fastest nearby
- MOT4400404 · 400 kW · 0.1 mi