Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

EH - MOTO Woolley Edge Northbound

M1 Jct 38, 39, Darton, WF4 4LQ

EH - MOTO Woolley Edge Northbound is an EV charging site in Darton, Barnsley, run by GRIDSERVE and open 24 hours a day. Its 16 sockets reach up to 200 kW, with CCS at the top speed, and published prices run from £0.59 to £0.92 per kWh. Recorded live status shows it is usually busiest around 2 pm, and Amp Map measured 96% uptime and recorded 1745 charging sessions here over the last 30 days. 1 other charging site is listed within a mile, and the nearest other site with 50 kW or more is EH - MOTO Woolley Edge Southbound (GRIDSERVE), 0.2 miles away.

Status

8 of 16 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 200 kW9 connectors · 92p per kWh4 free1 in use1 out of service3 status unknown
#3Status unknown
#41% reliabilityOut of order
#599% reliabilityAvailable
#9100% reliabilityStatus unknown
#10100% reliabilityStatus unknown
#11100% reliabilityAvailable
#12100% reliabilityAvailable
#13100% reliabilityAvailable
#14100% reliabilityCharging
CCS or CHAdeMO · 200 kW3 connectors · 92p per kWh2 free1 in use
#6100% reliabilityAvailable
#7100% reliabilityAvailable
#8100% reliabilityCharging
CCS · 50 kW1 connector · 92p per kWh1 in use
#1100% reliabilityCharging
CHAdeMO · 50 kW1 connector · 92p per kWh1 free
#2100% reliabilityAvailable
Type 2 · 11 kW2 connectors · 59p per kWh1 free1 in use
#15100% reliabilityAvailable
#16100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Open 24 hours
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card
Getting there
To the right of Moto building entrance.

Facilities

HotelRestaurantCaféShoppingFuel stationWi-Fi

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS200 kW92p per kWh
CHAdeMO100 kW92p per kWh
CCS50 kW92p per kWh
CHAdeMO50 kW92p per kWh
Type 211 kW59p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 200 kW CCS~23 min · ≈ 55 kWh · ~£51
Tesla Model 3 Rear-Wheel Drive 10–80% · 200 kW CCS~23 min · ≈ 40 kWh · ~£37
Audi Q4 e-tron 50 10–80% · 200 kW CCS~39 min · ≈ 51 kWh · ~£47
Hyundai IONIQ 5 10–80% · 200 kW CCS~19 min · ≈ 51 kWh · ~£47
MG Motor MG4 Trophy 10–80% · 200 kW CCS~30 min · ≈ 43 kWh · ~£39
Hyundai Kona Electric Long Range 10–80% · 200 kW CCS~39 min · ≈ 41 kWh · ~£37
Nissan LEAF 10–80% · 100 kW CHAdeMO~54 min · ≈ 28 kWh · ~£26

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at EH - MOTO Woolley Edge Northbound (GRIDSERVE)?

The listed price is CCS £0.92/kWh · CHAdeMO £0.92/kWh · CCS £0.92/kWh · CHAdeMO £0.92/kWh · Type 2 £0.59/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at EH - MOTO Woolley Edge Northbound (GRIDSERVE)?

Up to 200 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does EH - MOTO Woolley Edge Northbound (GRIDSERVE) have?

16 charging sockets: 1 × 50 kW CCS, 1 × 50 kW CHAdeMO, 12 × 200 kW CCS, 3 × 100 kW CHAdeMO, 2 × 11 kW Type 2. Live per-socket availability is shown on this page.

Is EH - MOTO Woolley Edge Northbound (GRIDSERVE) open 24/7?

Yes - EH - MOTO Woolley Edge Northbound (GRIDSERVE) is open 24 hours a day, 7 days a week.

When is EH - MOTO Woolley Edge Northbound (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 2 pm and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is EH - MOTO Woolley Edge Northbound (GRIDSERVE)?

Amp Map measured 96% uptime here from recorded live status over the last 30 days, across 1745 observed charging sessions.

Who operates EH - MOTO Woolley Edge Northbound?

EH - MOTO Woolley Edge Northbound is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to EH - MOTO Woolley Edge Northbound (GRIDSERVE)?

EH - MOTO Woolley Edge Southbound (GRIDSERVE) is 0.2 miles away in a straight line, with up to 200 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at EH - MOTO Woolley Edge Northbound (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 55 kWh (~£51 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EH - MOTO Woolley Edge Northbound (GRIDSERVE)?

A typical 10–80% rapid charge takes about 23 min on the 200 kW CCS here, adding roughly 40 kWh (~£37 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at EH - MOTO Woolley Edge Northbound (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 200 kW CCS here, adding roughly 51 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.