Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

GRIDSERVE · EV charging site

HU - Teals

1 Orchard Lane, Yeovil, BA22 7FS

HU - Teals is an EV charging site in Yeovil, Somerset, run by GRIDSERVE and open Mon–Sun 07:00–18:30. Its 12 sockets reach up to 148 kW, with CCS at the top speed, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 1 pm, and Amp Map measured 51% uptime and recorded 1631 charging sessions here over the last 30 days. No other charging site is listed within a mile, and the nearest other site with 50 kW or more is McDonald's Sparkford (InstaVolt Ltd), 1.8 miles away.

Status

3 of 12 available

Checking status…

VerifiedLive status and details from GRIDSERVE’s data feed. Amp Map updates them automatically.Last synced 20 Nov 2026

Connectors

CCS · 148 kW8 connectors · 85p per kWh2 free6 out of service
#152% reliabilityOut of order
#452% reliabilityAvailable
#551% reliabilityOut of order
#654% reliabilityAvailable
#754% reliabilityOut of order
#850% reliabilityOut of order
#952% reliabilityOut of order
#1052% reliabilityOut of order
CHAdeMO · 80 kW2 connectors · 85p per kWhOut of service
#246% reliabilityOut of order
#1146% reliabilityOut of order
Type 2 · 22 kW2 connectors · 85p per kWh1 free1 out of service
#353% reliabilityOut of order
#1253% reliabilityAvailable

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Operator
GRIDSERVE
Opening hours
Mon–Sun 07:00–18:30
Parking
On-street
Payment
Bank card at the chargerIn the GRIDSERVE appRFID card

Facilities

Nature

Always check directly with the charge point operator for the most up-to-date information.

Prices

ConnectorPowerPrice
CCS148 kW85p per kWh
CHAdeMO80 kW85p per kWh
Type 222 kW85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 148 kW CCS~27 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 148 kW CCS~24 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 148 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 148 kW CCS~23 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 148 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 148 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 80 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at HU - Teals (GRIDSERVE)?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at HU - Teals (GRIDSERVE)?

Up to 148 kW DC via CCS, CHAdeMO, Type 2.

How many charging sockets does HU - Teals (GRIDSERVE) have?

12 charging sockets: 8 × 148 kW CCS, 2 × 80 kW CHAdeMO, 2 × 22 kW Type 2. Live per-socket availability is shown on this page.

When is HU - Teals (GRIDSERVE) open?

Opening hours: Mon–Sun 07:00–18:30.

When is HU - Teals (GRIDSERVE) busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 1 pm and quietest around 6 am. The live status on this page shows what is free before you set off.

How reliable is HU - Teals (GRIDSERVE)?

Amp Map measured 51% uptime here from recorded live status over the last 30 days, across 1631 observed charging sessions.

Who operates HU - Teals?

HU - Teals is on the GRIDSERVE network.

Where is the nearest other charger with 50 kW or more to HU - Teals (GRIDSERVE)?

McDonald's Sparkford (InstaVolt Ltd) is 1.8 miles away in a straight line, with up to 120 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at HU - Teals (GRIDSERVE)?

A typical 10–80% rapid charge takes about 27 min on the 148 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at HU - Teals (GRIDSERVE)?

A typical 10–80% rapid charge takes about 24 min on the 148 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at HU - Teals (GRIDSERVE)?

A typical 10–80% rapid charge takes about 39 min on the 148 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: GRIDSERVE · synced 20 Nov 2026

Amp Map does not take payment. You pay the operator.