Zero Carbon World · EV charging site
The Newt in Somerset
Haspen, Yeovil, BA7 7NG
The Newt in Somerset is an EV charging site in Yeovil, Somerset, run by Zero Carbon World. All 4 of its sockets are 22 kW Type 2, and charging is listed as free. No other charging site is listed within a mile, and the nearest site with 50 kW or more is FJ Chalke Nissan (Nissan UK Dealer Network), 3.4 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Zero Carbon World
- Opening hours
- Not published
- Access
- Public
- Price
- Free(from Open Charge Map, 19 Oct 2020)
- Phone (from Open Charge Map)
- +44 (0)1963 577777
- Notes
- Public access during opening hours
- Getting there
- https://thenewtinsomerset.com/visitor-information OPENING TIMES 1 May – 30 September 10am–6pm, last entrance 5pm 1 October – 30 April 10am–4.30pm, last entrance 3.30pm
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at The Newt in Somerset (Zero Carbon World)?
The listed price is Free. Prices can change, so check the price at the charger before you start.
How fast is charging at The Newt in Somerset (Zero Carbon World)?
Up to 22 kW AC via Type 2.
How many charging sockets does The Newt in Somerset (Zero Carbon World) have?
4 charging sockets: 4 × 22 kW Type 2.
Who operates The Newt in Somerset?
The Newt in Somerset is on the Zero Carbon World network. For site issues, the operator lists +44 (0)1963 577777.
Where is the nearest charger with 50 kW or more to The Newt in Somerset (Zero Carbon World)?
FJ Chalke Nissan (Nissan UK Dealer Network) is 3.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at The Newt in Somerset (Zero Carbon World)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at The Newt in Somerset (Zero Carbon World)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at The Newt in Somerset (Zero Carbon World)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Millbrook Gardens Car Park SSDC
- Pod Point Hauser and Wirth Somerset - Durslade Farm
- Tolbury Mill Car Park SSDC
- FJ Chalke Nissan
- McDonald's Wincanton
- The Wagtail, Wincanton
- Cheapest nearby
- Pod Point Hauser and Wirth Somerset - Durslade Farm · 60p per kWh · 22 kW · 2.7 mi
- Fastest nearby
- The Wagtail, Wincanton · 75 kW · 3.5 mi