InstaVolt Ltd · EV charging site
McDonald's Wincanton
Lawrence Hill, Yeovil, BA9 9RT
McDonald's Wincanton is an EV charging site in Yeovil, Somerset, run by InstaVolt Ltd. Both of its sockets are 50 kW CCS and CHAdeMO, and the price is listed as £0.75/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is The Wagtail, Wincanton (Osprey Charging), 50 yards away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 5 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at McDonald's Wincanton (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at McDonald's Wincanton (InstaVolt Ltd)?
Up to 50 kW DC via CCS, CHAdeMO.
How many charging sockets does McDonald's Wincanton (InstaVolt Ltd) have?
2 charging sockets: 2 × 50 kW CCS, 2 × 50 kW CHAdeMO.
Who operates McDonald's Wincanton?
McDonald's Wincanton is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to McDonald's Wincanton (InstaVolt Ltd)?
The Wagtail, Wincanton (Osprey Charging) is 50 yards away in a straight line, with up to 75 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at McDonald's Wincanton (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at McDonald's Wincanton (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at McDonald's Wincanton (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- The Wagtail, Wincanton
- FJ Chalke Nissan
- Morrisons Wincanton
- Memorial Hall Car Park
- Hunters Lodge Inn
- The Newt in Somerset
- Cheapest nearby
- Memorial Hall Car Park · 56p per kWh · 44 kW · 0.7 mi
- Fastest nearby
- The Wagtail, Wincanton · 75 kW · 50 yd