InstaVolt Ltd · EV charging site
Costa Gosforth
Costa Gosforth, NE3 5EH
Costa Gosforth is an EV charging site in Gosforth, Newcastle upon Tyne, run by InstaVolt Ltd. All 6 of its sockets are 50 kW CHAdeMO and CCS, and the price is listed as £0.75/kWh. 2 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Shell Recharge Shell Gosforth, 1.1 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Costa Gosforth (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Costa Gosforth (InstaVolt Ltd)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Costa Gosforth (InstaVolt Ltd) have?
6 charging sockets: 6 × 50 kW CHAdeMO, 6 × 50 kW CCS.
Who operates Costa Gosforth?
Costa Gosforth is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Costa Gosforth (InstaVolt Ltd)?
Shell Recharge Shell Gosforth is 1.1 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Costa Gosforth (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Costa Gosforth (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Costa Gosforth (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- NGP Park & Ride
- Morrison Newcastle Great Park
- Shell Recharge Shell Gosforth
- North Road Filling Station Newcastle
- St Nicholas Hospital
- Northumbria Police
- Cheapest nearby
- Shell Recharge Shell Gosforth · 85p per kWh · 150 kW · 1.1 mi
- Fastest nearby
- Shell Recharge Shell Gosforth · 150 kW · 1.1 mi