Amp Map is in beta - data and features are still being developed. Any feedback is appreciated.Amp Map is in beta. Send feedback

Shell Recharge · EV charging site

Shell Recharge Shell Gosforth

Great North Road, Gosforth, NE3 2DT

Shell Recharge Shell Gosforth is an EV charging site in Gosforth, Newcastle upon Tyne, run by Shell Recharge and open 24 hours a day. Its 6 sockets reach up to 150 kW, with CCS at the top speed, and the published price is £0.85 per kWh. Recorded live status shows it is usually busiest around 10 am, and Amp Map measured 100% uptime and recorded 746 charging sessions here over the last 30 days. 3 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is North Road Filling Station Newcastle (GeniePoint), 0.4 miles away.

Status

All 6 in use

Checking status…

VerifiedLive status and details from Shell Recharge’s data feed. Amp Map updates them automatically.Last synced 22 Nov 2026

Connectors

CCS · 150 kW4 connectors · 85p per kWh4 in use
01-1100% reliabilityBlocked
01-2100% reliabilityCharging
02-1100% reliabilityCharging
02-2100% reliabilityBlocked
CCS or CHAdeMO · 150 kW2 connectors · 85p per kWh2 in use
03100% reliabilityCharging
04100% reliabilityCharging

Reliability is the share of time each socket was not out of order, over the last 30 days.

Site information

Opening hours
Open 24 hours
Payment
In the Shell app
Charger ID
03

Facilities

Fuel stationShop

Always check directly with the charge point operator for the most up-to-date information.

Prices

85p per kWh

Price at the charger, including VAT. Paying in the operator's app may cost less.

Charge times by car

Charge window10–80%
Tesla Model Y Long Range 10–80% · 150 kW CCS~27 min · ≈ 55 kWh · ~£47
Tesla Model 3 Rear-Wheel Drive 10–80% · 150 kW CCS~24 min · ≈ 40 kWh · ~£34
Audi Q4 e-tron 50 10–80% · 150 kW CCS~39 min · ≈ 51 kWh · ~£43
Hyundai IONIQ 5 10–80% · 150 kW CCS~23 min · ≈ 51 kWh · ~£43
MG Motor MG4 Trophy 10–80% · 150 kW CCS~30 min · ≈ 43 kWh · ~£36
Hyundai Kona Electric Long Range 10–80% · 150 kW CCS~39 min · ≈ 41 kWh · ~£35
Nissan LEAF 10–80% · 70 kW CHAdeMO~54 min · ≈ 28 kWh · ~£24

Estimates assume a typical charge curve and a warm battery.

Reviews

No reviews yet. Be the first to rate this charger.

Rate this charger

Common questions

How much does it cost to charge at Shell Recharge Shell Gosforth?

The listed price is £0.85/kWh. Prices can change, so check the price at the charger before you start.

How fast is charging at Shell Recharge Shell Gosforth?

Up to 150 kW DC via CCS, CHAdeMO.

How many charging sockets does Shell Recharge Shell Gosforth have?

6 charging sockets: 6 × 150 kW CCS, 2 × 70 kW CHAdeMO. Live per-socket availability is shown on this page.

Is Shell Recharge Shell Gosforth open 24/7?

Yes - Shell Recharge Shell Gosforth is open 24 hours a day, 7 days a week.

When is Shell Recharge Shell Gosforth busiest?

Measured from recorded socket occupancy across the week, it is typically busiest around 10 am and quietest around 11 pm. The live status on this page shows what is free before you set off.

How reliable is Shell Recharge Shell Gosforth?

Amp Map measured 100% uptime here from recorded live status over the last 30 days, across 746 observed charging sessions.

Who operates Shell Recharge Shell Gosforth?

Shell Recharge Shell Gosforth is on the Shell Recharge network.

Where is the nearest other charger with 50 kW or more to Shell Recharge Shell Gosforth?

North Road Filling Station Newcastle (GeniePoint) is 0.4 miles away in a straight line, with up to 50 kW. Check its live status before you set off.

How long does a Tesla Model Y Long Range take to charge at Shell Recharge Shell Gosforth?

A typical 10–80% rapid charge takes about 27 min on the 150 kW CCS here, adding roughly 55 kWh (~£47 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Shell Recharge Shell Gosforth?

A typical 10–80% rapid charge takes about 24 min on the 150 kW CCS here, adding roughly 40 kWh (~£34 at the published price). Estimates assume a typical charge curve and a warm battery.

How long does an Audi Q4 e-tron 50 take to charge at Shell Recharge Shell Gosforth?

A typical 10–80% rapid charge takes about 39 min on the 150 kW CCS here, adding roughly 51 kWh (~£43 at the published price). Estimates assume a typical charge curve and a warm battery.

Data: Shell Recharge · synced 22 Nov 2026

Amp Map does not take payment. You pay the operator.