InstaVolt Ltd · EV charging site
Great North Road
Great North Road, Milford Haven, SA73 2NA
Great North Road is a planned EV charging site in Milford Haven, Pembrokeshire, run by InstaVolt Ltd. It has a single socket, with CHAdeMO and CCS at up to 50 kW, and the price is listed as £0.75/kWh. 4 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Y Cerrig Glas, Pembroke Dock (Osprey Charging), 3.9 miles away.
Status
Coming soon
Listed as coming soon. Check before you travel.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 5 Apr 2023)
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Great North Road (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Great North Road (InstaVolt Ltd)?
Up to 50 kW DC via CHAdeMO, CCS.
How many charging sockets does Great North Road (InstaVolt Ltd) have?
1 charging socket: 1 × 50 kW CHAdeMO, 1 × 50 kW CCS.
Who operates Great North Road?
Great North Road is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Great North Road (InstaVolt Ltd)?
Y Cerrig Glas, Pembroke Dock (Osprey Charging) is 3.9 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Great North Road (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 70 min on the 50 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Great North Road (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 50 min on the 50 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Great North Road (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 66 min on the 50 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Milford Haven Port Authority Car Park
- Milford Haven Leisure Centre
- Charles Street
- Pod Point Tesco Superstore - Milford Haven
- High Street Car Park, Neyland
- Pembroke Dock Ferry Terminal
- Cheapest nearby
- Pod Point Tesco Superstore - Milford Haven · 44.4p per kWh · 7 kW · 0.6 mi