Silverstone Green Energy · EV charging site
Milford Haven Leisure Centre
Priory Road, Milford Haven, SA73 2EE
Milford Haven Leisure Centre is an EV charging site in Milford Haven, Pembrokeshire, run by Silverstone Green Energy. Both of its sockets are 22 kW Type 2. 3 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Y Cerrig Glas, Pembroke Dock (Osprey Charging), 4.2 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Silverstone Green Energy
- Opening hours
- Not published
- Access
- Public
- Find it
- Street View of this spot ↗
Facilities
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at Milford Haven Leisure Centre (Silverstone Green Energy)?
Up to 22 kW AC via Type 2.
How many charging sockets does Milford Haven Leisure Centre (Silverstone Green Energy) have?
2 charging sockets: 1 × 22 kW Type 2, 1 × 22 kW Type 2.
Who operates Milford Haven Leisure Centre?
Milford Haven Leisure Centre is on the Silverstone Green Energy network.
Where is the nearest charger with 50 kW or more to Milford Haven Leisure Centre (Silverstone Green Energy)?
Y Cerrig Glas, Pembroke Dock (Osprey Charging) is 4.2 miles away in a straight line, with up to 60 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Milford Haven Leisure Centre (Silverstone Green Energy)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Milford Haven Leisure Centre (Silverstone Green Energy)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Milford Haven Leisure Centre (Silverstone Green Energy)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Great North Road
- Pod Point Tesco Superstore - Milford Haven
- Charles Street
- Milford Haven Port Authority Car Park
- Pod Point Walwyns Castle
- Cheapest nearby
- Pod Point Walwyns Castle · 34.8p per kWh · 7 kW · 3.5 mi
- Fastest nearby
- Great North Road · 50 kW · 0.4 mi