InstaVolt Ltd · EV charging site
Instavolt [Southbrook Retail Park Gloucester]
Eastern Avenue, Gloucester, GL4 3BU
Instavolt [Southbrook Retail Park Gloucester] is an EV charging site in Gloucester, Gloucestershire, run by InstaVolt Ltd. Its 2 sockets reach up to 120 kW, with CCS at the top speed, and the price is listed as £0.75/kWh. 7 other charging sites are listed within a mile, and the nearest other site with 50 kW or more is Barnwood SF Connect (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- InstaVolt Ltd
- Opening hours
- Not published
- Access
- Public
- Payment
- Pay at the charger (from Open Charge Map)
- Price
- £0.75/kWh(from Open Charge Map, 3 Mar 2023)
- Notes
- 2 hour stay, no return for 2 hours Starbucks and McDonald's nearby
- Getting there
- Car Park for Magnet kitchens
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How much does it cost to charge at Instavolt [Southbrook Retail Park Gloucester] (InstaVolt Ltd)?
The listed price is £0.75/kWh. Prices can change, so check the price at the charger before you start.
How fast is charging at Instavolt [Southbrook Retail Park Gloucester] (InstaVolt Ltd)?
Up to 120 kW DC via CCS, CHAdeMO.
How many charging sockets does Instavolt [Southbrook Retail Park Gloucester] (InstaVolt Ltd) have?
2 charging sockets: 2 × 120 kW CCS, 2 × 100 kW CHAdeMO.
Who operates Instavolt [Southbrook Retail Park Gloucester]?
Instavolt [Southbrook Retail Park Gloucester] is on the InstaVolt Ltd network.
Where is the nearest other charger with 50 kW or more to Instavolt [Southbrook Retail Park Gloucester] (InstaVolt Ltd)?
Barnwood SF Connect (BP Pulse) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at Instavolt [Southbrook Retail Park Gloucester] (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 31 min on the 120 kW CCS here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at Instavolt [Southbrook Retail Park Gloucester] (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 26 min on the 120 kW CCS here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at Instavolt [Southbrook Retail Park Gloucester] (InstaVolt Ltd)?
A typical 10–80% rapid charge takes about 40 min on the 120 kW CCS here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Barnwood SF Connect
- EVC Barnwood Point Business Park
- The Edward Hotel
- Esso Longlevens
- Holiday Inn Gloucester - Cheltenham
- Wheatstone Inn (Gloucester)
- Cheapest nearby
- Wheatstone Inn (Gloucester) · 85p per kWh · 300 kW · 1 mi
- Fastest nearby
- Wheatstone Inn (Gloucester) · 300 kW · 1 mi