Roam Charging · EV charging site
EVC Barnwood Point Business Park
Corinium Ave, Gloucester, GL4 3HX
EVC Barnwood Point Business Park is an EV charging site in Gloucester, Gloucestershire, run by Roam Charging. All 6 of its sockets are 22 kW Type 2. 7 other charging sites are listed within a mile, and the nearest site with 50 kW or more is Barnwood SF Connect (BP Pulse), 0.3 miles away.
Status
No live status
We don't have live status for this charger. Check it when you arrive.
Connectors
Site information
- Operator
- Roam Charging
- Opening hours
- Not published
- Access
- Public
- Phone (from Open Charge Map)
- 0330 111 2999
- Find it
- Street View of this spot ↗
Always check directly with the charge point operator for the most up-to-date information.
Reviews
No reviews yet. Be the first to rate this charger.
Common questions
How fast is charging at EVC Barnwood Point Business Park (Roam Charging)?
Up to 22 kW AC via Type 2.
How many charging sockets does EVC Barnwood Point Business Park (Roam Charging) have?
6 charging sockets: 6 × 22 kW Type 2.
Who operates EVC Barnwood Point Business Park?
EVC Barnwood Point Business Park is on the Roam Charging network. For site issues, the operator lists 0330 111 2999.
Where is the nearest charger with 50 kW or more to EVC Barnwood Point Business Park (Roam Charging)?
Barnwood SF Connect (BP Pulse) is 0.3 miles away in a straight line, with up to 150 kW. Check its live status before you set off.
How long does a Tesla Model Y Long Range take to charge at EVC Barnwood Point Business Park (Roam Charging)?
A 10–80% charge takes about 5h 2m on the 22 kW Type 2 here, adding roughly 55 kWh. Estimates assume a typical charge curve and a warm battery.
How long does a Tesla Model 3 Rear-Wheel Drive take to charge at EVC Barnwood Point Business Park (Roam Charging)?
A 10–80% charge takes about 3h 38m on the 22 kW Type 2 here, adding roughly 40 kWh. Estimates assume a typical charge curve and a warm battery.
How long does an Audi Q4 e-tron 50 take to charge at EVC Barnwood Point Business Park (Roam Charging)?
A 10–80% charge takes about 4h 39m on the 22 kW Type 2 here, adding roughly 51 kWh. Estimates assume a typical charge curve and a warm battery.
Chargers near this site
- Barnwood SF Connect
- Wheatstone Inn (Gloucester)
- Esso Longlevens
- Holiday Inn Gloucester - Cheltenham
- Instavolt [Southbrook Retail Park Gloucester]
- Greyhound, Gloucester
- Cheapest nearby
- Wheatstone Inn (Gloucester) · 85p per kWh · 300 kW · 0.4 mi
- Fastest nearby
- Wheatstone Inn (Gloucester) · 300 kW · 0.4 mi